The Depco Inspection Process

The power equipment testing process is extremely important to our company. We have two load banks, one 750kW and one 2MW, and a dyno facility to test all generator sets and industrial engines.
During these 1-hour minimum tests we check:
  • Unit pulls at full load
  • Cooling system function
  • Lube oil pressure
  • No oil, fuel, coolant leaks
  • Base pressure
  • Voltage fluctuation
  • Responsiveness to load changes
  • Turbo boost
  • Fuel pressure
  • Oil temperature
  • AC voltage
  • AC current
  • AC frequency
All our products must pass their manufacturers’ specifications. If they do not pass, we send them to repairs immediately and test them again prior to making them available for sale. With Depco, you are guaranteed quality inventory whenever you make a purchase from us.